Centersquare BOS1-A
- Fuel Type Natural Gas
- Application Data Center
- kW Production 1,994 kW
- Location Waltham, Massachusetts
About This Project
- The Centersquare BOS1-A data center in Waltham, Massachusetts, with a total area of 165,968 m², is one of the leading locations for data center services in the greater Boston area.
- Centersquare relies on two highly efficient avus 1000plus combined heat and power units from 2G Energy.
- In its first year of operation, Centersquare is expected to save around $360,000 in energy costs compared to the conventional supply from the local energy supplier.
- The system covers over 75% of peak load requirements and supplies the data center with 88% of its annual electricity consumption. Thanks to its load-following operation and island mode, the system responds flexibly to actual energy requirements, ensuring uninterrupted operation even in the event of external power failures.
- Developed, integrated, financed, and operated by Unison Energy.